Site Drawing Upgrade Completed Feb 2011
The hospital has topographical drawings in "Autocad" of the property, but they are out of date. There are many new buildings on the property that need to be added to the drawings as well as utility upgrades. We need drawings to locate valves and other utilities for service and future construction.

People: 2-3 to come to the hospital and document the locations. 1 Autocad technician to update the drawings and produce copies needed for the hospital staff.

Cost: Travel expenses and material needed to produce drawings.

Tools: Survey equipment to complete the project. The hospital needs a transit level if the team would like to bring and donate one.

Contact: Mike Yost at yostmp@lomadeluz.net


Laundry Storage Loft
In the hospital's laundry area, a storage loft needs to be constructed of wood floor joist covered with planking. The project includes steps to the loft and hand rail, some drywall work, painting and minor electrical.

People: Four construction/carpenter type people

Time: 1 week

Cost: $2,000 for construction material.

Tools: Personal carpentry hand tools. Power tools are available at hospital.